to the second floor
there were so many cuts out of the framing that we had to "sister" new joists onto the old ones.
there were also alot of rotten floor boards...so they needed to be ripped out and replaced with new subfloor before we move forward.
once the plywood patches go in, we can install a layer of tile backer board.
the plumber is coming next week to rough plumb the kitchen and baths.
No comments:
Post a Comment