Friday, January 9, 2009

basement renovation progress

the end is in sight...
the new back door (it just needs paint)
the previous door was alot smaller than a standard door size and so was the opening in the concrete wall. so we had to jack-hammer the concrete wall at the sill to get the new door to fit!

we installed the engineered oak floor and cabinet doors:

we put an electrical outlet inside the tall pantry cabinet so that we can put a microwave in there to save space on the counter.


we got an island from Ikea:
Scott sanded the butcher block top





a little before and "after"


the bathroom:

No comments:

Post a Comment

Related Posts Plugin for WordPress, Blogger...