Basement Reno- Final touches

the carpet was installed...


we chose a frize this time- its a bit of a shag:


installed the recessed light trim rings:


the fridge was delivered (its a bit short!):



we stained the island countertop a similar hue as the floor and we added towel bars to the sides:


curtain rods were hung:


the bed was delivered:


closet doors were hung-and painted:


closet organizer was installed:



Friday, January 9, 2009

basement renovation progress

the end is in sight...
the new back door (it just needs paint)
the previous door was alot smaller than a standard door size and so was the opening in the concrete wall. so we had to jack-hammer the concrete wall at the sill to get the new door to fit!

we installed the engineered oak floor and cabinet doors:

we put an electrical outlet inside the tall pantry cabinet so that we can put a microwave in there to save space on the counter.


we got an island from Ikea:
Scott sanded the butcher block top





a little before and "after"


the bathroom: