Sunday, March 17, 2013

powder room sneaky-peaky

Small renovations sure move along quickly!
In 5 days, the finishes were removed, wet wall was insulated, textured ceiling was skim coated with smooth plaster, plumbing was updated, and tile was installed.
 
starting with the floor tile:
honey onyx sable creme cordellina from tileshop.com
 
we also received the shipment of the fancy smooth-sided toilet:
Eago TB353 from FaucetDirect.com
 
a standard toilet flange looks like this and goes in quickly:
 
the flange for the fancy smooth sided toilet looks like this and takes way to long to  install:
 
the wall tile was also installed:
 
I need to get a new camera, my iphone is just not cutting it!
next week: tile grout and sealer, fixture installation,
paint, light fixture, window treatment, ...and finito!

No comments:

Post a Comment

Related Posts Plugin for WordPress, Blogger...