Wednesday, March 27, 2013

Powder Room-almost finished!

 
 
 
 
 
 
 
 

Sunday, March 17, 2013

powder room sneaky-peaky

Small renovations sure move along quickly!
In 5 days, the finishes were removed, wet wall was insulated, textured ceiling was skim coated with smooth plaster, plumbing was updated, and tile was installed.
 
starting with the floor tile:
honey onyx sable creme cordellina from tileshop.com
 
we also received the shipment of the fancy smooth-sided toilet:
Eago TB353 from FaucetDirect.com
 
a standard toilet flange looks like this and goes in quickly:
 
the flange for the fancy smooth sided toilet looks like this and takes way to long to  install:
 
the wall tile was also installed:
 
I need to get a new camera, my iphone is just not cutting it!
next week: tile grout and sealer, fixture installation,
paint, light fixture, window treatment, ...and finito!

Sunday, March 3, 2013

Powder Room Re-do

Our next project will be to complete a gut reno of the powder room (hopefully in time for Easter!)
 
Here is the before:

 
 
and here is the "mood board" showing the new products that we just ordered:
 
 
we are only planning on tiling the floor and the wet wall, and painting the remaining 3 walls (white, of course!).
we wanted to use a classic stone tile, but were also looking for a modern mosaic shape;
after much searching we finally settled on the yellow 1x6 onyx mosaic (a tile that scott had previously installed in a kitchen backsplash- and it looked amazing!)
 
 
i'm looking forward to having a new- fresh- clean powder room!
let the fun begin!
 