Tuesday, July 10, 2012

Pool Update

alot has happened since the last post.  for one, we moved in...thus the huge delay in updating this blog.  there is alot to post, so let's begin with the pool:

6/21/12: old plaster was removed and underground plumbing installed


6/27/12: rough grading and forms for the concrete decking


 6/28/12: concrete placed

 7/7/12: tile selection (we chose the small mosaic)


7/7/12: Equipment installation.  We are going with a salt water chlorine generator. 


 7/9/12: High pressure wash to remove loose plaster- to prepare the surface for the new plaster

 the concrete decking was acid washed to expose the aggregate



7/10/12: steps were rebuilt, water line tile substrate was prepped, scaffolding installed...in preparation for the tile installation tomorrow!