alot has happened since the last post. for one, we moved in...thus the huge delay in updating this blog. there is alot to post, so let's begin with the pool:
6/21/12: old plaster was removed and underground plumbing installed
6/27/12: rough grading and forms for the concrete decking
6/28/12: concrete placed
7/7/12: tile selection (we chose the small mosaic)
7/7/12: Equipment installation. We are going with a salt water chlorine generator.
7/9/12: High pressure wash to remove loose plaster- to prepare the surface for the new plaster
the concrete decking was acid washed to expose the aggregate
7/10/12: steps were rebuilt, water line tile substrate was prepped, scaffolding installed...in preparation for the tile installation tomorrow!