so here are a bunch of progress photos (in no particular order)
KITCHEN: finished installing and grouting the backsplash tile
BATH1: Finished installing and grouting the bath surround tile
installed the fixtures: toilet and vanity
love the sink- got it at lowe's
BATH2: tile installed and grouted...door installed...toilet and vanity too!
DINING ROOM: engineered floating click-lock oak flooring is getting installed (as i write this post)
the nice people from lowe's came to the house today to move the fridge from the garage to its final resting spot!
Slate floor at entry foyer and first floor bath is installed, sealed and grouted. just needs one more coat of sealer (3 total). I love the aluminum transition strip that we have installed between the slate and wood.
BASEMENT: flooring was installed. It is resilient vinyl plank flooring.
it's a little dusty! we also installed the oak "pole wraps" over the lally columns.
and last but not least...
BASEMENT: brick veneer wall (what did she say?) yes, brick. veneer. wall.
It is real brick, just 3/8" thick.
still dont know if we are just crazy for doing this!