we had three trades working at the house today: plumbing, electrical, hvac.
i cant tell you how happy that makes me!  even though we are all in each others way!



pex hot + cold water supplies at ceiling of foyer-  the plan is to drop the ceiling 6" in the foyer to accommodate the new plumbing for the 2nd floor bathroom. 


kitchen sink drain, vent and water supplies


bathtub valve and supplies


bath sink supplies and vent...and the main vent stack


scott and i ran all of the new electrical circuits and roughed in the wiring at the boxes
here is our handy dandy work

the electrician is going to install the new 200 amp panel
here are all of the ends of the new circuit runs that are left to dangle at the panel...until the electrician hooks them up.  it looks messy, but they are all labeled and organized!

the hvac contractor re-used existing ducts in order to re-feed the upstairs bedrooms.
they had to be relocated because they were originally in walls that we removed!