Progress!!!

The backside of the upper roof is finished...

on to the front side:


The existing roof was already 2 layers thick-so those shingles needed to be stripped before the new shingles could be installed:

The painted wood columns and beams at the front porch were sanded and prepped for paint:
We bought Valspar low temperature exterior paint- which will enable us to paint in temps as low as 35 degrees (hoping it will be warmer though!)



and finally, the new furnace with A/C coil was installed today.  it's nice and toasty in the house now!
the A/C unit will be installed tomorrow.