when we added a 2nd bath upstairs, the waste pipe for that toilet had to drop below the ceiling in the 1st floor bath...so we had to enclose those pipes in a soffit that will be just above the new vanity.
we also installed 3" recessed adjustable gimball lights within that soffit.
the first floor bathroom walls are done...we are renting a drywall panel lift from home depot to install all of the ceiling panels (to hopefully make it a bit easier!)
No comments:
Post a Comment