Tuesday, November 20, 2007

the siding is under way and will probably be finished up by wednesday...we used the same color siding as the previous flip (it is in stock at lowe's).


we also decided to remove the existing bathtub in the first floor bathroom. it was in bad shape and it is actually cheaper to replace it than it is to have it refinished.

it was a cast iron tub, so we took a sledge hammer to it and broke it up into more manageable pieces. it was alot easier than i expected (you just have to put a towel over the tub before you smash it because the porcelain fractures into tiny shards)

we bought two new fiberglass bathtubs...a deeper soaker tub for the 2nd floor bath


our plumber has started to run the new waste and vent lines in the basement;

No comments:

Post a Comment

Related Posts Plugin for WordPress, Blogger...