Saturday, May 26, 2012

it's nothing but a duck toilet...

Before

 
...and now! Three weeks into the renovation


The framing for the new kitchen and pantry is complete
and the Pella Impervia windows have all been installed.

this is the view of the pantry:
The rough electrical is underway.  The electrical service will be upgraded next week.  We will hopefully be finished with electrical so that we can move on to insulation and boarding next week!

where the built-in shelving in the hall will be:


The rough plumbing was completed and we passed inspection:

because the house is on a concrete slab, and the plumbing runs below the slab, i made sure- when redesigning the kitchen layout- to keep the sink in pretty much the same location... to avoid having to bust up the slab and re-route the plumbing

The plumbing vent had a long way to travel, because of the windows.


in the meantime...I started to install the  floating flooring in the bedrooms...Home Legend click-lock bamboo that we got at Home Depot (special order)


I got one bedroom finished!.

...well, at least the flooring is in!

remember this pool? 

Home to frogs, ducks, mosquitos?

well, we got a couple of quotes to renovate it and after we got over the initial shock, we decided that we have to take care of this mess and do it right so that it will last many years to come.  So hopefully soon I will be posting photos of this transformation! 



I'll leave you with this....after the duck hung out for a while, it stood at the edge of the pool, turned around, and pooped!...into the pool water! guh!  as if it wasn't bad enough!

Saturday, May 19, 2012

Wall down!

we removed the wall between the kitchen and dining room...installed a couple of windows (the other two will be delivered on monday!)  framed the wall to the living room (on the left in the pic), and next we will frame the walls of the pantry (to the right in the pic)



Thursday, May 17, 2012

Removing an exterior bearing wall...all in a days work


When I arrived at the house in the morning...the exterior wall had been stripped of the siding the day before and Scott had started to remove the windows:


He had also constructed a temporary wall. 
to support the roof trusses while we remove and reframe the exterior bearing wall:


He built the temp wall about 4 feet in from the exterior wall- there are no nails or fasteners in the temp wall, its basically held together with friction



the exterior wall sheathing was removed:


then we attacked the framing:


opening up the entire exterior wall


We then installed a new 16' long beam to span the new windows and support the roof load:


framed out the new windows:


by the end of the day, the rain had started- we were able to install the plywood sheathing and get the wall closed in...next we install the windows!

Sunday, May 13, 2012

Demolition Derby!

Jumped right in and demolished the kitchen...
Sold the appliances on Craigslist...love Craigslist!

This wall will soon be removed and reframed to accommodate four new windows and a door.  The plumbing will also need to be re-routed



here is another view...
that wall on the left is going to be removed altogether. 

the good news is that the roof is framed with trusses that can span 30', so that wall is not a bearing wall and it can easily be removed. 


We also had a chimney safety inspection and had it cleaned.  While they were at it, they removed the old brass doors (nice, one less thing we have to do!)  The chimney sweep recommended using Simply Green to clean the soot from the bricks..we will try that soon! 


so, it turns out that there is also a flue going to the upper right firebox that you can see here in the picture. Apparently all we need is some charcoal, a grate and we can go to town grilling up some grub in our living room!  saaaweeeeeet!

Monday, May 7, 2012

we're baaaaaaaaaack!

ok...i know. it's been a full year and I never wrote a final post for the renovation of the 2010 Colonial.

Well, the short story is that we sold the house- after two weeks of it being on the market- for a few grand less than asking.  not bad.

But enough about that house- let's move on to our next project: a 1965 slab ranch!   We just closed this past Friday and the renovation has begun.  This reno will be completely different from the others on this blog because this isnt a flip- this house is actually for us--finally!

here are some before pictures:











 EXISTING PLAN:

PROPOSED PLAN:


Related Posts Plugin for WordPress, Blogger...